Project-specific factory completion

Finished Modular Homes

Factory-prepared modular homes from China can range from higher-completion units to factory-prepared components that require more assembly on site. The exact level depends on the selected product, dimensions, configuration and transport conditions.

Backed by a manufacturing factory with 29 years of production experience.

Finished modular home exterior catalogue reference
Higher Factory Completion Reference

Plan your project

Planning a modular home or accommodation project?

A preliminary project direction starts with the product, approximate size, layout, quantity, destination and preferred factory completion level. Sunhomee can then identify the questions needed for the reference budget range and shipping direction.

Helpful details to send

Approximate unit size, number of rooms, bathroom scope, destination, reference layout and how much work you would prefer to complete before shipping.

Reference price:

USD 399–699/m² EXW

Finished modular homes are typically quoted at approximately USD 399–699/m² EXW, depending on the selected product, size, materials and configuration.

Factors affecting the final price include:

  • Exterior wall material specifications
  • Insulation system and thermal performance requirements
  • Window and door specifications (including double glazing or triple glazing options)
  • Interior layout and space planning requirements
  • Customization requirements
  • Certification and compliance requirements
  • Order quantity

The reference price includes the finished interior decoration scope based on the confirmed model and specification.

Items such as kitchen packages, bathroom equipment, furniture and other equipment are confirmed according to the selected product, configuration and formal quotation.

Send Your Project Requirements

Completion Level

Factory completion defines which product, interior, finish and component work is prepared before shipping.

EXW / FOB / CIF

EXW can be discussed first. FOB or CIF requires destination and confirmed cargo information.

Project Orders

Size, layout, quantity, configuration and destination shape the quotation direction.

Packing Direction

Packing is determined after the product, supply condition and packed dimensions are confirmed.

Higher Factory CompletionProject-Specific Completion LevelMore Site Assembly

The actual completion level depends on the selected product, dimensions, configuration and transport conditions.

Important scope note

Finished does not always mean fully furnished.

Factory-completed describes work prepared before shipping; furnished describes movable furniture and soft furnishings. Final inclusion depends on the selected product, configuration and formal quotation.

  • Confirm house size, layout, rooms and bathroom quantity.
  • Confirm interior, bathroom, finish and optional equipment scope.
  • Confirm how much work is prepared before shipping and what remains for the site.
Two-storey finished modular house reference
Two-Storey Finished Modular House Reference
Finished interior bedroom reference
Finished Interior Reference
Interior configuration example
Interior Configuration Example
Bathroom configuration example
Bathroom Configuration Example
Interior finish reference
Interior Finish Reference
Finished bedroom with windows and mountain view
Bedroom / View Reference

Final material and finish selection is project-specific.

Commercial Modular Units

Selected commercial modular units can be discussed separately, such as prefab offices, modular office units, sales offices, site offices, reception rooms, small showrooms, staff rooms, temporary business spaces, and project site support spaces. These are not standard finished home models. Send drawings or reference photos for quotation, and confirm local approval requirements with local professionals.

Commercial modular sales office reference

Sales Office / Reception Unit

Commercial display unit reference for sales offices, reception rooms, site offices or small showrooms. Final scope is confirmed by drawings and project conditions.

Two-storey commercial modular display reference

Two-Storey Display Space

Commercial modular reference for reception, sales, showroom or temporary business use. Local approval requirements should be confirmed before quote.

Completed modular home result reference
Completed Result Reference

Exterior and component reference

Confirm facade, layout, and completion level before quote.

These reference images show different completion, packing and site conditions; they do not document one continuous customer project.

Factory-prepared modular components reference
Factory-Prepared Components Reference
Prepared modular unit condition inside a factory
Prepared Unit / Semi-Finished Factory Reference
Protected modular components prepared for handling
Packing Preparation Reference
Protected components positioned on a transport vehicle
Packed Unit Transport Preparation Reference

Backyard Cabin Reference

Backyard cabin and utility projects can be discussed for guest rooms, garden offices, storage rooms, rental units, or small private accommodation. Confirm size, layout, facade, bathroom or kitchen scope, and delivery method before quotation.

Backyard cabin scene reference with deck

Backyard Guest Cabin

Reference scene for deck position, access steps, facade direction and compact guest-unit layout planning.

Factory display reference for compact backyard cabin module

Factory Display Reference

Reference for compact module body, wall cladding, door and window position, and factory-prepared finish.

Backyard storage shed reference

Storage Shed Reference

Reference for compact support space planning, door position, storage access and small utility module use.

Packing and Site Work: What to Confirm

Separate the confirmed factory-side scope from the local work that may still be required.

Before Shipment

Before shipment, confirm the prepared product or component condition, packing direction and factory-side scope against the formal quotation.

Factory-prepared structural components
Product / Components PreparedVisible component condition before the final supply scope is confirmed.
Protected components prepared for factory handling
Packing PreparationPacking and handling direction must follow the actual product and route.
Prepared structural component reference inside the factory
Prepared Structural Components ReferenceFinal factory-side work is defined by the confirmed configuration and quotation.
On Site

Site work may include unloading, positioning, assembly or connection, foundations, utilities and other local work required by the project.

Installed modular unit position reference in a snowy setting
Installed Unit Position ReferenceLocal equipment and access depend on the unit, route and site conditions.
Visible site assembly and connection work
Site Assembly / Connection ReferenceVisible site work varies with the agreed completion and supply condition.
Installed modular unit result reference
Completed / Site Result ReferenceLocal finishing and connections still follow the project-specific scope.

These are separate reference visuals and do not represent one continuous customer project.

Buyer-Side Scope

These items are normally handled locally unless included in the signed quotation.

Site Work

Foundation, ground preparation, local drainage, permits, lifting equipment, assembly or positioning labor, and final utility connection.

Local Compliance

Engineering review, local code approval, and permit documents should be checked by buyer or local consultant.

Not Included

Movable furniture and soft furnishings are not included. This includes beds, mattresses, bedding, loose chairs, loose tables, curtains, and decorative soft items.

Quotation Details

Final pricing depends on drawings, configuration, quantity, and loading plan.

DetailWhat to Confirm
Size and layoutOverall dimensions, floor plan, room count, bathroom and kitchen position.
Completion levelDefine the product-specific work prepared before shipping and the work remaining at the site.
Interior finishWall, ceiling, floor, doors, bathroom fittings, and optional kitchen package under the confirmed delivery method. Movable furniture and soft furnishings are not included.
PackingPacking and loading direction after confirmed drawings, component scope, quantity and transport conditions. See how to ship one prefab cabin from China.
Trade termEXW first. FOB or CIF can be checked after destination details.

Common Questions

Direct answers about factory completion, quotation scope, shipping and local work.

What does factory-completed mean?

Factory-completed means work prepared at the factory before shipping. Completion can range from higher-completion units to factory-prepared components that require more assembly on site. The exact level depends on the selected product, dimensions, configuration and transport conditions.

What is the difference between finished and furnished?

Factory-completed describes work prepared before shipping; furnished describes movable furniture and soft furnishings. Final inclusion depends on the selected product, configuration and formal quotation.

How much do finished modular homes from China cost?

Finished modular homes are typically quoted at approximately USD 399–699/m² EXW, depending on the selected product, size, materials, configuration and quotation scope. EXW is not a delivered, landed or installed price.

What actually leaves the factory?

Depending on the confirmed product and transport conditions, either a higher-completion unit or factory-prepared components may leave the factory. The formal drawings and quotation define the exact supply condition.

What work remains on site?

Site work may include unloading, positioning, assembly or connection, foundations, utilities and other local work required by the project. The exact scope varies with the agreed completion level and local conditions.

What is included in the quotation?

The quotation defines the confirmed product, dimensions, configuration, factory-side scope, optional items, packing direction and buyer-side responsibilities. Items not stated as included should be confirmed before order.

How are finished modular homes shipped from China?

Packing is determined after the product, supply condition, packed dimensions, quantity and destination are confirmed. The suitable loading and shipping direction is then checked for the actual order.

What must be confirmed locally?

Confirm foundations and site preparation, access and lifting conditions, utilities, permits, local code review and the local labor required for positioning, assembly or connection.

Finished Modular Home Planning Guides

Check product boundary, design fee and quotation term details before comparing project pricing.

Finished modular home exterior style reference for project planning

Get a project quote

Ready to define the right completion level?

Send your project requirements and we will respond with the questions needed to define the product, factory-side scope, site-side scope and next-step quotation direction.

  • Product type and quantity.
  • Destination port or project city.
  • Required layout, kitchen/bathroom scope or reference photos.
WhatsApp: Get Quote