Backyard Guest Cabin
Reference scene for a compact backyard guest unit, garden office, or private stay module with deck.
Factory-completed or site-assembled
Finished Modular Homes can be supplied in two ways: factory-completed units for transport to site, or flat-pack components for site assembly. The confirmed quotation must state the delivery method, finished interior scope, appliance options if required, and buyer-side site work. Movable furniture and soft furnishings are not included.
Reference starting price
House package starting price before sea freight, import duty, foundation, utility connection, and on-site assembly cost. Reference sizes include 25 / 27 / 33 / 37 sqm planning layouts.
Factory-completed units or flat-pack / knockdown components for site assembly.
EXW quote can be prepared first. FOB or CIF needs destination port and loading details.
Suitable for rental cabins, worker housing, farm stays, camps, and repeat accommodation orders.
40HQ loading and packing plan are checked after layout, component list, and quantity are confirmed.
Important scope note
Finished means interior wall and ceiling finishes plus bathroom fittings under the confirmed delivery method. Movable furniture and soft furnishings are not included in the base quotation. Appliances are quoted separately only if required and confirmed in writing.
Exterior style reference
Finished Modular Homes can be quoted by exterior style, floor plan, wall panel, window package, and delivery method. Depending on model size and site plan, the order may be supplied as factory-prepared sections, completed modules, or knockdown components.
Backyard cabin and utility projects can be discussed for guest rooms, garden offices, storage rooms, rental units, or small private accommodation. Confirm size, layout, facade, bathroom or kitchen scope, and delivery method before quotation.
Reference scene for a compact backyard guest unit, garden office, or private stay module with deck.
Reference for compact module body, wall cladding, door and window position, and factory-prepared finish.
Reference for a compact storage room, tool shed, garden equipment room, or small utility module.
These items are normally handled locally unless included in the signed quotation.
Foundation, ground preparation, local drainage, permits, lifting equipment, assembly or positioning labor, and final utility connection.
Engineering review, local code approval, and permit documents should be checked by buyer or local consultant.
Movable furniture and soft furnishings are not included. This includes beds, mattresses, bedding, loose chairs, loose tables, curtains, and decorative soft items.
Final pricing depends on drawings, configuration, quantity, and loading plan.
| Detail | What to Confirm |
|---|---|
| Size and layout | Overall dimensions, floor plan, room count, bathroom and kitchen position. |
| Supply form | Factory-completed unit or flat-pack components for on-site assembly, subject to confirmed model and order scope. |
| Interior finish | Wall, ceiling, floor, doors, bathroom fittings, and optional kitchen package under the confirmed delivery method. Movable furniture and soft furnishings are not included. |
| Packing | Container loading plan and 40HQ quantity after confirmed drawings and component list. |
| Trade term | EXW first. FOB or CIF can be checked after destination details. |
Selected commercial modular units can be quoted separately, such as sales offices, reception units, and display spaces. These are not standard finished home models. Send drawings or reference photos for quotation.
Commercial display unit reference. Final structure, facade, signage, utilities, and local connection are quoted by drawings and project scope.
Commercial modular reference for reception, sales, or display use. Stair, terrace, glass, and local approval requirements should be confirmed before quote.
Quick answers for finished modular home buyers. The full FAQ covers quotation scope and trade terms.
Both can be discussed. The supply method depends on model, order scope, transport route, and installation plan.
Loading quantity is confirmed after drawings, component list, packing method, and 40HQ loading plan are checked.
Usually yes. Foundation, local permits, lifting, assembly labor, utility connection, and code review are normally buyer-side scope.